Click through this representative portfolio of our extensive public sector client project examples.
If you need further information on any of the projects listed on this page, please email that request to our marketing department.
| | | College Community School District Cedar Rapids Description: Prairie Middle School
In addition to being the Engineer of Record for this award-winning design, Hall & Hall responded to a series of challenges. To meet the challenge of linking the Middle School physically and emotionally with the campus on the west side of Kirkwood Boulevard, Hall & Hall helped the educational leaders plan the best possible solutions to the school’s facility challenges.
Prairie Middle School is a technologically superior facility. It is connected physically to the community’s heritage.
Size 742,900 sf Construction Cost $ 45 million Completion August 2008 | | back to top ^ | | |  | City of Cedar Rapids Police Facility Cedar Rapids, IA Description: Civil design and property survey of a 6-acre site for this new $14 million police facility
The project included new concrete surfacing, curb and gutter, signs and sidewalks. In addition to preparing plans, Hall & Hall Engineers, Inc. (HHE) provided the topographic and survey, storm drainage, and a site study. Our firm generated hydraulic reports, grading and scope of work reports. Services Provided: Survey Hydraulics Plan and special provision preparation Public relations Client: Novak Design Group | | back to top ^ | | |  | Phase 1: Seminole Valley Park - Sanitary Sewer Extension City of Cedar Rapids, IA Description: Design and surveying of a sanitary trunk sewer and box culvert replacement in the park. | | back to top ^ | | |  | Xavier High School Cedar Rapids, IA Description: Site design of the new high school, including parking lot, track and football fields, soccer fields, baseball fields and stormwater drainage design. | | back to top ^ | | |  | Brooklyn Wastewater Treatment Facility Brooklyn, IA Description: Plan of action report and design of this innovative wastewater treatment facility. Construction staking and management services were also provided. | | back to top ^ | | |  | College Community Schools / Prairie Schools Cedar Rapids, IA Description: Design, surveying and construction management on football fields, sites for new buildings, retention areas, and roadways. | | back to top ^ |
|
|
|